Ball explained butt welding in the construction of the following description when using :
1, to confirm the installation of ball location . When the ground water or moisture , or to change the installation location of water or moisture is completely removed , the site is not guaranteed to sink , the foundation must be strong pressure , then at this time the coloured cable ties was adjusted to a position level with the ground .
2 , the first end fixed to the pipe welding machine package after opening the ball valve , the ball is fixed at one end , if the fixed length is not sufficient butt welding machine , not fixed on the machine using two fixation of valve, ball valve and the other end fixed machine transferred the same height .
Fixed surface machining → → → heating plate mounting pressure welding heat to maintain → → → → cooling welding machine bonding separation
3 , the other end of the tube is fixed by welding After welding
NOTE: To identify the arrows on the operating side of the ball must be consistent with the flow of gas . In order to prevent the inflow plastic cable ties welding operations using different materials such as bags inside the inner surface of the ball to block the ball . Pipe and welded ball valve to the horizontal and vertical state .
4, after the separation of the welding machine takes about 30 minutes to cool
5 , the "T" type ball grip removed from the box , after assembly , and then fully inserted into the handle knobs . Note:
Use the "T" handle to test the ball off.
6 , to confirm whether the switching ball . ADAPTER linear PE pipe length and direction of the ball must be marked ( - and this was turned on, the straight line perpendicular direction indicator ( ‖ ) and this was closed, closed (CLOSE): In the open state of the ADAPTER clockwise direction rotate 90 °, open ( open ) : ? put in the closed state in the direction of counterclockwise rotation ADAPTER 90 °, GEARBOX of TOPADAPTER about 180 °, the switching operation of the rotation arrow 90 ° , the fully closed state (FULLCLOSE), the fully opened state (FULL open ) state can not be opened or closed momentum
7 , using the elution ball tightness test .
8 , ball knobs surrounding the use of sand laying.
1, to confirm the installation of ball location . When the ground water or moisture , or to change the installation location of water or moisture is completely removed , the site is not guaranteed to sink , the foundation must be strong pressure , then at this time the coloured cable ties was adjusted to a position level with the ground .
2 , the first end fixed to the pipe welding machine package after opening the ball valve , the ball is fixed at one end , if the fixed length is not sufficient butt welding machine , not fixed on the machine using two fixation of valve, ball valve and the other end fixed machine transferred the same height .
Fixed surface machining → → → heating plate mounting pressure welding heat to maintain → → → → cooling welding machine bonding separation
3 , the other end of the tube is fixed by welding After welding
NOTE: To identify the arrows on the operating side of the ball must be consistent with the flow of gas . In order to prevent the inflow plastic cable ties welding operations using different materials such as bags inside the inner surface of the ball to block the ball . Pipe and welded ball valve to the horizontal and vertical state .
4, after the separation of the welding machine takes about 30 minutes to cool
5 , the "T" type ball grip removed from the box , after assembly , and then fully inserted into the handle knobs . Note:
Use the "T" handle to test the ball off.
6 , to confirm whether the switching ball . ADAPTER linear PE pipe length and direction of the ball must be marked ( - and this was turned on, the straight line perpendicular direction indicator ( ‖ ) and this was closed, closed (CLOSE): In the open state of the ADAPTER clockwise direction rotate 90 °, open ( open ) : ? put in the closed state in the direction of counterclockwise rotation ADAPTER 90 °, GEARBOX of TOPADAPTER about 180 °, the switching operation of the rotation arrow 90 ° , the fully closed state (FULLCLOSE), the fully opened state (FULL open ) state can not be opened or closed momentum
7 , using the elution ball tightness test .
8 , ball knobs surrounding the use of sand laying.